• <ul id="ydmct"><thead id="ydmct"><acronym id="ydmct"></acronym></thead></ul>
        1. 69人人,色www88,亚洲中文字幕AV,五月丁香影院,精品熟女视频专区,97精品超碰一区二区三区,欧美黑人巨大videos精品,欧美成人综合
          ×
          full text search
          Search
          ×
          Prompt information:
          Confirm
          +8618562287971
          NEWS&EVENTS
          Home > News&Events > Company news > How to electrolyze crude tin with electrolytic equipment
          Latest News
          Its main purpose is to collect the high-temperature flue gas rich in Sb?O? that volatilizes from the smelting furnace...
          2025.11.12
          Choosing mature solvent extraction-electrowinning technology and reliable copper extraction equipment is undoubtedly a key step in achieving efficient resource conversion and maximizing economic value...
          2025.11.12
          In the copper sulfide ore smelting process, the anode casting step is crucial...
          2025.11.11
          Exploring key auxiliary processes in scrap copper smelting..
          2025.11.11
          This document details the electrolytic refining process of scrap copper in an electrolytic cell...
          2025.11.10

          How to electrolyze crude tin with electrolytic equipment

          Release time:2024-11-21 10:33 Views:

          The crude tin electrolysis method is a widely used pure tin process. It is a process that converts crude tin liquid containing impurities into high-purity tin through electrolytic equipment to meet various industrial and military needs.

          The characteristics of the crude tin electrolytic purification process are: ① shortened operation process; ② high useful metal content, ③ high tin yield, easy mechanized production and other advantages.

          Electrolytic refining (electrolyzer)

          The electrolytic production process of crude tin includes charge preparation, reduction smelting, tin discharge, slag discharge and other processes.

          Charge preparation

          In the process of electric furnace smelting, the calculation of raw material ratio is roughly the same as that of reverberatory furnace tin smelting. The charge can be powder ore, granular material or block material, which is sent to the top hopper of the furnace by stirring and then added in batches. When charging for the first time, the moisture content should be controlled below 2%.

          Reduction smelting

          Batch feeding is adopted, and the first batch of materials accounts for about 1/3 of the total amount. At the beginning of smelting, the current is controlled at a small value. After a certain amount of slag and crude tin is produced, the current is increased and the second batch of materials is added at the same time. After that, a batch of materials will be added every 2 hours, and all the materials will be added within 10 to 12 hours. The reduction and slag-making process of electric furnace smelting occurs almost simultaneously with the heating of the furnace charge, and the melt relies on the convection circulation of the superheated slag near the electrode to transfer electricity, heat and mass. The crude tin and slag produced are clarified and layered in the furnace.

          The batch feeding method is adopted, and the first feeding is about one-third of the total feeding material. In the early stage of smelting, the current is first adjusted to a low level. After a certain amount of slag and crude tin are generated, the current is increased and the second charge is added. After that, a batch of materials will be added every 2 hours, and all the materials will be added within 10 to 12 hours. In electric furnace smelting, the reduction and slag-making process is carried out simultaneously with the heating of the furnace charge, and the melt mainly relies on the convection circulation near the superheated slag to transfer electricity, heat and mass. The crude tin slag produced is layered in the furnace.

          Slag and tin discharge

          The process of multiple tin discharge and one slag discharge is adopted. After half of the material is fed, the first tin discharge begins, and each furnace is discharged 3 to 4 times. After the last batch of materials is added and melted, add the last tin, and then release the slag once. The crude tin contains 97% to 98% tin. After the slag is released, it is concentrated in an electric furnace for the second smelting, or it can be carried out without releasing the slag.

          The electrolytic refining technology of crude tin has become one of the mainstream processes in the tin processing industry, with the advantages of high production efficiency and high product purity.

          A new technology of multiple tin release and one slag release is proposed. When the material is half full, the first batch of tin is added, and one furnace is added 3-4 times. After the last addition and melting, the last tin is added, and the slag is thrown out once. The content of crude tin is between 97% and 98%. After the slag is discharged, it is concentrated in an electric furnace for secondary smelting, or it is not released and the secondary smelting is continued.

          The purification of crude tin electrolytic equipment is an efficient and high-purity tin smelting facility.


          主站蜘蛛池模板: 18禁超污无遮挡无码网址| 国产精品白浆一区二小说| 日本成人网址| 乱女乱妇熟女熟妇综合网| 精品一区二区三区在线观看 | 亚洲精品乱码久久久久久中文字幕 | 成在线人午夜剧场免费无码| 一本色道久久综合无码人妻| av在线播放观看国产| 91性爱视频| 永清县| 涩涩国产在线不卡无码| 久久精品国产亚洲av麻豆不卡| 亚洲成人综合社区| 蜜臀AⅤ永久无码精品| 无码精品人妻一区二区三区中| 国产精品无码成人午夜电影| 国产中文字幕精品在线| 欧美做受视频播放| 亚洲中文字幕第一页在线 | jizz喷水外围| 国产精品久久久免费视频| 使劲快高潮了国语对白在线| 四虎影院176| 亚洲精品一品区二品区三品区| 久久精品国产精品亚洲综合| 产综合无码一区| 中文字幕免费不卡二区| k频道国产在线观看| 国产肉感大码AV无码| 黑人巨茎大战欧美白妇| 奇米四色7777中文字幕| 欧美xxxx做受欧美| 亚洲经典一区二区三区四区| 国产成人a亚洲精品网| 亚洲精品国产摄像头| 亚洲国产成人无码AV在线| AV成人无码久久精品区一区二| 国产剧情无码中文字幕在线观看不卡视频 | 亚洲avav天堂av在线网爱情| 中文字幕一区二区三区人妻精品|